Cover

Mobile fallback data center for healthcare organization LENTIS

RUNNING FLAWLESSLY “The mobile data center is running flawlessly. You don’t really notice it’s there.” That’s how Automation Manager Eppe Wolfis of the healthcare organization Lentis responds when asked how he likes the “ENGIE Mobile Data Center – powered by Legrand” (EMDC), now that it has been running for more than a year. The EMDC is the fallback data center that was delivered to Lentis in Zuidlaren. The EMDC is housed in a humble shipping container and holds a fully-fledged data center that runs synchronously with the existing data center that is located within two hundred meters of the EMDC.

THE SOLUTION: A CONTAINER
Wolfis went in search of a concept to make his idea a reality. The search brought him to a school in the city of Groningen where a completely new mobile data center had been set up on the roof of the temporary school in a shipping container after a fire. “That’s the solution,” Wolfis thought, and he tracked down the supplier of the mobile data center, which turned out to be ENGIE. According to Wolfis, it soon became clear that ENGIE had a great deal of knowledge and experience in the field of data centers, for example, with a complete Mobile Data Centers program – in cooperation with Legrand Data Center Solutions. ENGIE was therefore one of the two parties with which Lentis entered into discussions.

DECISIVE FACTORS
According to the Automation Manager, the decisive factors in choosing the EMDC included the conceptual solution and the favorable maintenance scenario for a period of five years, combined with the purchase price and the focus on “Green IT”. According to Wolfis, “Green IT” means, for example, the solution for cooling the EMDC. Rather than using air conditioners, the cooling capacity of the outside air is used. “Two hundred days a year, the outside temperature is lower than what you need in a data center. That results in considerable energy savings,” he explains. “In addition, the modular cooling solution ensures optimum availability and scalability. The cooling solution is scalable to such an extent that when IT demands extra capacity, the cooling capacity is automatically scaled up. That way, there is never any unnecessary use of cooling capacity. So, that is also a saving.”

A RESOUNDING “YES”
“If you ask me if I would recommend the EMDC, my answer is undoubtedly YES,” Wolfis continues. “In case of an IT failure, you have only one chance to get it right. And we have every confidence in this mobile solution in the event of a disaster. For example, we have practiced moving the 8x3 meter container together several times. The container can be in place in Groningen in under four hours.” Everything is correct, down to the last detail, summarizes the Automation Manager. “And that inspires the necessary confidence. After all, when it comes to choosing an IT fallback solution, you don’t want to make a rash decision. The continuity of your organization stands or falls with it. In our case, fifty locations are linked to the EMDC and we still have quite a bit of capacity remaining. The container is now half full. In that way, the solution is scalable, and therefore we are ready for the future.”




Logo From the ground to the Cloud with Interoute Logo Dataplace provides more certainty in a 24/7 economy Logo Multinational Atos chooses Minkels Free Standing Cold Corridor Logo Sevel’s data center forms basis for daily production of 1,200 commercial vehicles Logo Vodafone Netherlands chooses Interconnect and Minkels data centre infrastructure Logo Pioneer Vancis: a modern data centre for the past thirty years Logo SenseLAN builds on Minkels Vertical Exhaust Duct Logo World’s largest data centre campus on renewable energy Logo Istanbul airport: new airport, new infrastructure Logo An interview with MainOne Logo Telecity acquisition helps Equinix EMEA expand into new markets in Europe Logo UK-based Datum Datacentres selects Minkels’ VED system for its cutting-edge, London area facility Logo ESI Group deploys HPC Center in Paris with Minkels and Legrand Logo MatrixCube perfect for Van Marcke CO2-neutral warehouse Logo Wolfsburg on the road to becoming a smart city Logo Swisscom relies on Minkels high-density (cooling) racks and monitoring services Logo Minkels provides an identical Equinix look-and-feel worldwide, also in Dubai Logo The Data Center Group opts for partner that thinks along with them Logo French ministries move data centres to Paris skyscraper Logo CEO Datacenter.com explains why Nexpand was the logical choice   Logo Complete data centre solution for Infonet DC Estonia Logo University in Wageningen chooses Minkels Logo Mobile fallback data center for healthcare organization LENTIS Logo With its all-new data center, RATP is looking to  the future Logo Bulk Norway: building the world’s largest data centre campus on renewable energy Logo IBAarau – renamed  Eniwa in 2018 -   upgrades data centre services Logo High-density fibre & rack solution for Equinix France Logo Minkels offers comtrance GmbH complete and modular solution Logo Freightliner & Comms Room Services implement Minkels Logo Plieger opts for IT continuity and optimum availability Logo Strategic growth and collaboration with Interxion Logo Sustainable data centre for the Krimpenerwaard municipality Logo All IT Rooms uses Legrand Data Center Solutions in Heerlen NL Logo German company 23media expands into Europe with dedicated hosting offering Logo Tieto is expanding the biggest commercial data centre in Finland Logo Crédit Agricole Bank chooses Minkels aisle containment Logo EvoSwitch is well prepared for future growth Logo Universitair Ziekenhuis Brussel selects Minkels DX and H2O row-based cooling Logo NeoCenter Ouest places its trust in the Legrand Group for its data centre in Rochesur-sur-Yon Logo Minkels global rack supplier Hitachi Logo The data centre challenges of the Academic Medical Center (AMC) in Amsterdam Logo Maroc Telecom provides data storage to SMEs at Casablanca data center Logo Modular data centre for European ‘trusted cloud’ Logo GB Muri modernises existing data centre and lowers fixed costs Logo Easy IT architecture rollout through Global Consistency Logo MainOne plans to expand its data centre business MDXi