Side skirts 19-inch with cutouts

The side-skirt seals the area between the Vertical Mounting Rails and optionally the side plate frame. It is mounted to the Vertical Mounting Rails. This part is only applicable for 800mm wide cabinets. It features 5 rectangular cut-outs for 42U cabinets on each side. The size of the cut-outs is 63mm x 200mm (WxH). These cut-outs enable front to back cable management through the use of brushes (A002Y-080000-000-1) and the front-to-back cable duct (A0037-000001-900-1). An optimal air tight cable throughput is also available (A004C-000001-900-1). Optionally cover plates maybe used as well when cable entry is not required.

Item code Colour Height in U Width
A0014-080038-400-1 White 38 800 mm
A0014-080038-900-1 Black 38 800 mm
A0014-080042-400-1 White 42 800 mm
A0014-080042-900-1 Black 42 800 mm
A0014-080047-400-1 White 47 800 mm
A0014-080047-900-1 Black 47 800 mm
A0014-080052-400-1 White 52 800 mm
A0014-080052-900-1 Black 52 800 mm
Logo Minkels global rack supplier Hitachi Logo SenseLAN builds on Minkels Vertical Exhaust Duct Logo French ministries move data centres to Paris skyscraper Logo GB Muri modernises existing data centre and lowers fixed costs Logo UK-based Datum Datacentres selects Minkels’ VED system for its cutting-edge, London area facility Logo Dataplace provides more certainty in a 24/7 economy Logo Sevel’s data center forms basis for daily production of 1,200 commercial vehicles Logo NeoCenter Ouest places its trust in the Legrand Group for its data centre in Rochesur-sur-Yon Logo Wolfsburg on the road to becoming a smart city Logo High-density fibre & rack solution for Equinix France Logo Swisscom relies on Minkels high-density (cooling) racks and monitoring services Logo Vodafone Netherlands chooses Interconnect and Minkels data centre infrastructure Logo Sustainable data centre for the Krimpenerwaard municipality Logo Freightliner & Comms Room Services implement Minkels Logo IBAarau – renamed  Eniwa in 2018 -   upgrades data centre services Logo An interview with MainOne Logo Minkels provides an identical Equinix look-and-feel worldwide, also in Dubai Logo MainOne plans to expand its data centre business MDXi Logo German company 23media expands into Europe with dedicated hosting offering Logo Plieger opts for IT continuity and optimum availability Logo All IT Rooms uses Legrand Data Center Solutions in Heerlen NL Logo Istanbul airport: new airport, new infrastructure Logo Telecity acquisition helps Equinix EMEA expand into new markets in Europe Logo Bulk Norway: building the world’s largest data centre campus on renewable energy Logo Strategic growth and collaboration with Interxion Logo EvoSwitch is well prepared for future growth Logo Mobile fallback data center for healthcare organization LENTIS Logo Pioneer Vancis: a modern data centre for the past thirty years Logo Tieto is expanding the biggest commercial data centre in Finland Logo University in Wageningen chooses Minkels Logo Crédit Agricole Bank chooses Minkels aisle containment Logo Maroc Telecom provides data storage to SMEs at Casablanca data center Logo ESI Group deploys HPC Center in Paris with Minkels and Legrand Logo World’s largest data centre campus on renewable energy Logo Multinational Atos chooses Minkels Free Standing Cold Corridor Logo The Data Center Group opts for partner that thinks along with them Logo Easy IT architecture rollout through Global Consistency Logo From the ground to the Cloud with Interoute Logo CEO Datacenter.com explains why Nexpand was the logical choice   Logo Complete data centre solution for Infonet DC Estonia Logo Minkels offers comtrance GmbH complete and modular solution Logo Modular data centre for European ‘trusted cloud’ Logo MatrixCube perfect for Van Marcke CO2-neutral warehouse Logo An interview with Michel Lanners, CIO of LU-CIX: “It’s more than just a product that has brought us together.” Logo The data centre challenges of the Academic Medical Center (AMC) in Amsterdam Logo Universitair Ziekenhuis Brussel selects Minkels DX and H2O row-based cooling